留下您的信息
Case Study of the Caides Project in Egypt

Compound fertilizer (NPK)cases

Case Study of the Caides Project in Egypt

Project Overview

Project location: Caides Fertilizer Company near Aswan and Abu Dhabi, Egypt
Product name: Granular phosphate fertilizer and superphosphate fertilizer production line
Production scale: 4x100000 tons/y
Service scope: Full-line process design, including raw material transportation, batching system, crushing and screening system, full set of equipment supply, dust removal system, electrical control, etc.
The entire production line includes: batching system, mixer, crusher, rotary dryer, rotary cooler, drum granulator, coating machine, conveyor, fan, hot air furnace, dust collector, screw conveyor, electrical equipment, PLC control system, etc.

Project photo display

case1 (1)
case1 (2)
case1 (3)
case1 (4)
case1 (5)
case1 (6)